Laserfiche WebLink
Monitoring System Certification-Page 3 of 3 <br /> Site Address: � Date of Testing/Servicing: /,__A <br /> F. In-Tank Gauging L SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete-the tollo ing checklist: <br /> 0 Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes 0 No* I Were all probes reinstalled properly? <br /> ❑Yes ❑No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLD's are not installed. <br /> Complete the folio ' checklist: <br /> A,Yes ❑No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑N/A (Check all that apply) Simulated leak reate:R.3 g.p h.(1.); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h. (2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Yes ❑No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> #Yes ❑No* Was the testing apparatus properly calibrated? <br /> ar-Yes ❑No* For mechanical LLD's,does the L.LD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> 4W/A <br /> ❑Yes ❑No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 4N/A or disconnected? <br /> ❑Yes ❑No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> Q�N/A malfunctions or fails a test? <br /> 0 Yes 0 No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> A44/A <br /> &Yes 0 No* Were all items on the a 'pment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: � k b Ir,—azA (41 / <br />