Laserfiche WebLink
MAY-28-2010 19:53 Service Station Systems 488 938 8888 P.04 <br /> 10. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ l <br /> Fill Riser Containment Sumps are Present,but were Not Tested [J i <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard p Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum M Hydrostatic <br /> (Specify) <br /> [I Otho <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +1-0.002" <br /> Fill Sump#87 Fill Sump#89 Fill Sump#91 <br /> Sump Diameter: 44" 44" 44" <br /> Sump Depth: 56" 56" j 56" <br /> Height from Tank Top to Top of N/A N/A j N/A <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 20" 15" l5" <br /> Electrical Penetration: <br /> Condition of sump prior to Good Good Good <br /> testing: <br /> Portion of Sum Tested 2"above piping 2"above 21ping 2"above piping <br /> Sump Material: Fiberglass Fiberglass Fiberglass _ <br /> Wait time between applying <br /> presst►re/vacuum/water and 30 minutes I 30 minutes 30 minutes <br /> starting test: -- <br /> Test Start Tune: 8:05 am 8:05 am 8:05 am <br /> Initial Reading(R,): 4.0222 2.4762 4.6622 <br /> Test End Time: 8:20 am 8:20 am 8:20 atn <br /> Final Reading(R,,): 4.02172.4761 4.6622 <br /> Test Duration: ! 15 min. 15 min. 15 min. <br /> Change in Reading Rr-R,): -0.0005 -0.0001 None <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: El Pass C Fail El Pass ❑Fail © Pass ❑ Fail <br /> i <br /> Is there a sensor in the sump? ® Yes ❑No ® Yes ❑ No ® Yes ❑No <br /> Does the sensor alarm when <br /> either product or water is ! ❑Yes Q No M NA ❑Yes ❑No ®NA ❑ Yes❑No ®NA <br /> detected? _ <br /> Was sensor removed for testing? ® Yes❑No ❑NA ®Yes❑No ❑NA ® Yes ❑ No ONA <br /> Was sensor properly replaced and M Yes❑No ❑NA 0 Yes ❑No [INA ® Yes❑No CINA <br /> verified functional after testing? I <br /> Comments— (include information on repairs made prior to testing, and recommended follow-u ror foiled tests <br /> "Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />