Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES= NO 0 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsile as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank lop upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> install OPW drop tubes in 87,89 and 91 tanks <br /> install Phil-tite bucket in 91 fill sump <br /> install LD-200 LD in 89 STP sump <br /> replace and rewire VR-208 sensor in 87 STP sumpi <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> OPW 71 SO drop tubes <br /> Phil-cite 8500 series bucket <br /> Vaporless LD-2000 leak detector <br /> VR-208 sensor <br /> 2 <br />