Laserfiche WebLink
JUL-01-2011 09:32 Service Station Systems 408 938 8888 P.05 <br /> Nionitoring System Certification-Page 3 of 3 <br /> Site Address: 2448 W, Kettleman Ln. Date of Testing/Servicing: 5131/11 <br /> F. In-Tank Ganging/SIR Equipment; W Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the folio ing checklist: <br /> ❑ Yes ❑ No* I Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> 4 Yes ❑ No* Was accuracy of system water level readines tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak.Detectors(LLD). ❑ Check this box if LLD's are not installed. <br /> Com fete the folio ina checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ® 3 g,p.h. (1.); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h• (2). <br /> Notes: 1. Required for equipment start-up certification LnA annual certification. <br /> 2. Unless mandated by local as ency,certification required only for electronic LLD start-tip. <br /> ® Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> 11 Yes ❑ No* Was the testing apparatus properly calibrated? <br /> a Yes ❑ No* For mechanical LLD's,docs the LLD restrict product flow if it detects a teak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic L1,O's,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected'? <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 8 N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> " in Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments.• <br />