Laserfiche WebLink
07/03/2003 13: 29 209e32';152 WRIGHT ENVIRONMENTAL PAGE 02 <br /> FUEL DISPENSING STATION f� <br /> SECONDARY CONTAINMENT PIPING, TEST PROTOCOL �9 <br /> TANK PIPING SUMPS/U-NDER DISPENSER CONTAINMENT SUMPS <br /> BUSINESS NAME: <br /> LOCATION/ADDRESS: ( 0 r <br /> PHONE/FAX. <br /> OWNER/OPERATOR NAME: <br /> SCHEDULED TEST DATE: 3 1/ 413 <br /> PERMITTING AGENCY: <br /> INSPECTOR: <br /> PHONE: FAX: <br /> Wright Euvironmenal Services, Inc. <br /> General Contractor, Lic. No. 651501 A, B, Haz Mat <br /> Ph 209-833-0758 Fax 209-832-5152 <br /> 1. Clean sump of ail loose debris and other material: <br /> • Separate 'initial wash water' from "test water'' in labled and separate 55 gal. <br /> drums <br /> �- Inspect all penetrations into sump for damage too or zn.issing test boots <br /> • electrical, product. vapor(make note by sump No.) <br /> 3. Repair and reseal penetrations from inside sump as may be required, <br /> • Clean ail penetrations removing scale and surface irregularities <br /> • Bostic sealant is best for sealing around penetrations <br /> • Disconnect piping and or remove dispenser if required to slip replacemen: boots <br /> into place over primary;product iine and over secondary containment piping; <br /> • Insmil split test boots as needed <br /> • Install spacers in test boots as required. <br /> 4. Mate secondary comainment pipe to mfg. recommended test pressure (3-5 psi). <br /> 5. Allow pressure to stabilize for a few minutes and verify correct test pressure. <br /> 6. Record date, start time and test pressure on sump wall or cover for each test point <br /> 7. Soap test all test boots inspecting for bubbies/leaks. <br /> S. .Record any change in pressure after one hour, test passes of pressure does no: drop <br /> below 3-psi in I hour. <br /> NOTE: <br /> Secondar;; containmentpiping :est should be corrpieted before starting :ake test of Burr.p(s). <br /> Verify that conduit pene,rations are not lower than, highest product line penetrai ions) <br /> (conduits do nor seai). If such 1 condition exists. seal conduit .fittings and penetration, with <br /> :ttzi c: znpattoie .>eaiant (b1�C� _L -z:cr ;t; test of sump the test! <br />