My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 1986 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 5:00:26 PM
Creation date
5/1/2019 1:13:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2004
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging'or SIR equipment is installed. <br /> This section must be completed it in-tank gauging equipment is used to perrorm leak detection monitoring. <br /> Co lete the following checklist: <br /> Y ; ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for around faults" { <br /> Y s ❑ No* I Were all tank gauging probes visually inspected for damage and residue buildup? <br /> s ❑ No* I Was accuracy of system product level readings tested? <br /> zr Yes ❑ No* { Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> a Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Lille Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist.: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all:hat apply) Simulated leak rate: ❑ 3 g.p.h.; ❑0.1 g.p.h; 0 0.2 g.p.h. <br /> ❑ Yes I ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> roYes I :3 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak' <br /> 4 ❑ N/A <br /> ❑ Yes ❑ No* i For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> i 0 N/A or disconnected^. <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off i2 any portion of the monitoring system malfunctions ; <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A f <br /> ❑ Yes ; '❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.