Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging'or SIR equipment is installed. <br /> This section must be completed it in-tank gauging equipment is used to perrorm leak detection monitoring. <br /> Co lete the following checklist: <br /> Y ; ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for around faults" { <br /> Y s ❑ No* I Were all tank gauging probes visually inspected for damage and residue buildup? <br /> s ❑ No* I Was accuracy of system product level readings tested? <br /> zr Yes ❑ No* { Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> a Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Lille Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist.: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all:hat apply) Simulated leak rate: ❑ 3 g.p.h.; ❑0.1 g.p.h; 0 0.2 g.p.h. <br /> ❑ Yes I ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> roYes I :3 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak' <br /> 4 ❑ N/A <br /> ❑ Yes ❑ No* i For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> i 0 N/A or disconnected^. <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off i2 any portion of the monitoring system malfunctions ; <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A f <br /> ❑ Yes ; '❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />