Laserfiche WebLink
SWRCB, January 2002 FINAL DRAFT Page 3 of 7 <br /> 5. SECONDARY PIPE TESTLNG <br /> I Test Method Developed By ❑ Piping Manufacturer ❑ Indus: Standard ❑ P afessional Engineer <br /> i Cst Method Used: assure ❑ Vacuum ❑ H•:drostatic <br /> E 1 c5t Equipment Used: I EQu�ip4 crit <br /> Pipio?Ran 7 I Piping Ru Piping Ran 4I Piping Run <br /> Piping Material: <br /> Piping Manufacturer: I <br /> Piping Diameter: <br /> Length of Piping Run: _7 / <br /> Product Stored: <br /> (Method and location of i <br /> piping-run isolation: <br /> Wait time between applying i 1 <br /> pressure!vacuum,'«ater and jsf <br /> starting test: I I <br /> Test Start Time: 67 <br /> J Lnitial Reading (R,)' <br /> i Test End Time: <br /> 1 Final Reading (R,-): <br /> Test Duration: ' <br /> i Chance in Readins <br /> Pass,'Fail Threshold or <br /> Criteria: <br /> Test Result ❑Pa:s L Fail ! L�Pass ❑Fail i *Pass CIF2 1 ❑Pass LI Fail <br /> C0 P,Tn en is — (Include irforntwi0,7 or r:: rs Made prior to testing, end recoi.': .!ed tests.) <br /> Ja l s a75 <br />