Laserfiche WebLink
Received on 10/29/2019 <br /> • Tank 2 : Tank Overfill!!Protection Type- Reconranendinstalling. SJC EHD - CR <br /> • Tank2 : Tank Secondary/Interstitial Level Gouge Type -Recommendinstallirg interstitial monitoring device,this is <br /> a Fireguard Tank,device must be compatible with Tank. <br /> • Tank 2 : Tank Support Condition- Supports have paint failure and corrosion,Recommend cleaning and painting. <br /> • Tank 3 :Ancillary Equipment-Piping has paint failure and corrosion,Recornanend clearting and painting. <br /> • Tants 3 :Anti Siphon Valve installed?- Install anti-siphonvalves where the liquid level in a tarts is at a higher <br /> elevation than the mpplypipu g or dispensing unit. <br /> • Tants 3 : Corrosion-Corrosion present where pairt is failing Recorranend clearing andpairmng. <br /> • Tants 3 :Does the Emergency Vent Operate As Designed?-Had to force vent lid open with 5 pound <br /> sledgehanamr,Reconranend replacing vent. <br /> • Tants 3 :External Coating Condition- Paint failure present all over Tants,Recommend cleaning and painting. <br /> • Tank3 :FdlingProcedures PostedAtFdlAsRequired?- ImIallsignageatthefdlpoirttodocrsnertfilling <br /> procedures. <br /> • Tants 3 :Normal Vent Condition-Mesh is clogged,Recommend replacing vent. <br /> • Tank3 : Tank CopacityAnd Tank ID Posted On The Tank As Required?-Clearly label tarts with capacity and ID. <br /> Capacity labeled on Tants is incorrect,must place conect label on Tants. <br /> • Tants 3 : Tank Secondary/Interstitial Level Gauge Type -Reconranend installing interstitial morikoring device,This is <br /> a Fireguard Tants interstitial device must be compatible with this Tants. <br /> • Tank 3 : Tank Support Condition- Supports have paint failure and corrosion,Recommend cleaning and painting. <br /> Estimated Repair Total,if applicable: <br />