Laserfiche WebLink
AST SP001 ANNUAL INSPECTION Received on 10/29/2019 <br /> SJC EHD - CR <br /> Item Task Status <br /> 5.11 Overfill equipment a. Follow manufacturers instructions and regulatory r-Yes r-No rN/A <br /> requirements for inspection and functionality verification. <br /> b. Confirm device is suited for above ground use by the r-Yes r No ATN/A <br /> manufacturer.Make: ,Model: <br /> Comments: <br /> Liquid level equipment is level located inside Tank, mechanics check level. <br /> 6.0 Insulated Tanks <br /> 6.1 Insulation Insulation is free of: <br /> • Missing sections r-Yes r-No rN/A <br /> • Areas of moisture r-Yes r-No rN/A <br /> • Mold r-Yes r-No FN/A <br /> • Damage r-Yes r-No rN/A <br /> 6.2 Insulation cover orjacket Inspected and confirmed that insulation cover or jacket is free rYes r-No rN/A <br /> of damage that will allow water intrusion. <br /> Comments: <br /> 7.0 Miscellaneous <br /> 7.1 Electrical wiring and Are they in good condition9 r-Yes r No r N/A <br /> boxes <br /> 7.2 Labels and tags • No Smoking r-Yes 17 No r-N/A <br /> • NFPA Placards rYes r-No r-NIA <br /> • Capacity rYes r-No r-NIA <br /> • Contents r-Yes 17 No r-NIA <br /> • Fill Procedures <br /> • Emergency Contacts r-Yes 17 No r-NIA <br /> r Yes 17 No r N/A <br /> Comments: <br /> Labels marked as missing above should be placed on Tank. <br /> Additional Comments: <br /> \AO 6703819 SEFrEP.EFR 2016 <br />