Laserfiche WebLink
SANJ Q A Q U I N Environmental Health Department <br /> COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Oma: <br /> LODI USD-TRANSPORATION' 8205 CLUFF AVE. LODI Aril 162019 <br /> Other violations <br /> 4010 See below Unlisted Admminrauonloocumemauon violation .V .R .COS <br /> 4030 See below Unlisted Training violation In In In COS <br /> 4030 See bel ow un listed OperationarMamtenance vl cation 0 d nCOS <br /> 4000 See below Unlisted ReleasteLeakii ills violation In In In COS <br /> 4050 See below Unlisted Abandonmendillegal Dlsposallunauthorized Treatment violation .V .R .COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item N Remarks <br /> 301 CFR 112.5(x)Failed to amend Plan as necessary. <br /> The two 10,000 gallon diesel tanks appear to be permanently Terrill and this is not addressed in the SPCC plan. <br /> Amend the SPCC Plan for your facility in accordance with the general requirements in §112.7,and with any specific <br /> section of this part applicable to your facility,when there is a change in the facility design,construction,operation,or <br /> maintenance that materially affects its potential for a discharge as described in §112.1(b). Examples of changes that <br /> may require amendment of the Plan include,but are not limited to:commissioning or decommissioning containers; <br /> replacement,reconstruction,or movement of containers;reconstruction, replacement,or installation of piping <br /> systems;construction or demolition that might alter secondary containment structures;changes of product or service; <br /> or revision of standard operation or maintenance procedures at a facility.An amendment made under this section <br /> must be prepared within six months, and implemented as soon as possible, but not later than six months following <br /> preparation of the amendment.Plan should be amended when there is a change to the plan,facility design, <br /> construction,operation,or maintenance. <br /> Note: Permanently manifolded tanks are tanks that are designed, installed,or operated in such a manner that the <br /> multiple containers function as a single storage unit(67 FR 47122,July 17, 2002).Accordingly,the total capacity of <br /> manifolded containers is the design capacity standard for the sized secondary containment provisions(plus freeboard <br /> in certain cases). <br /> This is a minor violation. <br /> 619 CFR 112.7(fi Failed to train personnel on all discharge prevention details listed in this section. <br /> Oil handling personnel were not trained, per facility personnel At a minimum,oil handling personnel shall be trained in <br /> the operation and maintenance of equipment to prevent discharges;discharge procedure protocols; applicable <br /> pollution control laws,rules,and regulations;general facility operations; and the contents of the Spill Prevention, <br /> Control,and Countermeasure Plan.Immediately provide this training to all oil handling personnel and submit a copy of <br /> the training log to the EHD. <br /> This is a Class II violation. <br /> FMWM42 PR0515166 SO001 00.Hei <br /> EHD2801 Rcr.0.l2]Shi Page 4 of Abaveg J Peartlam store,AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />