Laserfiche WebLink
AST SP001 ANNUAL INSPECTION Received on 10/29/20' <br /> SJC EHD - CR <br /> General Inspection Information: <br /> (36 months from inspection <br /> Inspection Date: 6/1&2019 Retain Until Date. 6/1&2022 date) <br /> Prior Inspection Date: Unavailable Inspector Name. S.La.n <br /> Tacks Inspected(OMs):Mew Antifiee ANTIFREEZE <br /> Inspection Guidance: <br /> For equipment not included in this standard,follow the manufacturer recommended inspection/testing schedules and <br /> procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual <br /> inspection does not require a Certified Inspector. It shall be performed by an owner's inspectorwho is familiarwith the site <br /> and can identify changes and developing problems. <br /> Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or <br /> spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and <br /> disposed of it properly. <br /> In order to comply with EPA SPCC(Spill Prevention, Control and Countermeasure)rules, a facility must regularly test liquid <br /> level sensing devices to ensure proper operation(40 CFR 112.8(c)(8)(v)). <br /> Non-conforming items important to tank or containment intearity require evaluation by an engineer experienced in AST <br /> design, a Certified Inspector, or a tank manufacturerwho will determine the corrective action. Note the non-conformance and <br /> corresponding corrective action in the comment section. <br /> Retain the completed checklists for 36 months. <br /> Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition <br /> should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC <br /> development and implementation. <br /> Item Task Status <br /> 1.0 Tank Containment <br /> 1.1 Containment structure Is structure free of: rYes rNo rN/A <br /> • Holes or cracks in containment wall or floor r—Yes r—No rN/A <br /> • Washout r—Yes r—No PN/A <br /> • Liner degradation <br /> rYes rNo rN/A <br /> • Corrosion <br /> • Leakage r—Yes r—No rN/A <br /> • Paint failure r—Yes r—No PN/A <br /> • Tank settling FYes rNo 17N/A <br /> Comments: <br /> Double Wall Tank does not require Secondary containment. <br /> 2.0 Tank Foundation and Supports <br /> 2.1 Foundation Noobserved settlement or foundation washout? rYes r-No <br /> 2.2 Concrete pad or ring wall No visible cracking or spelling? r-Yes rNo rN/A <br /> 2.3 Supports No visible corrosion, paint failure, etc.? r-Yes rNo r-N/A <br /> 2.4 Water drainage Water drainage away from tank7 rYes r No r N/A <br /> 2.5 Tank grounding Strap secured and in good condition? r-Yes r-No rN/A <br /> If intrinsically ground, please note in comments. <br /> Comments: <br /> Supports have paint failure, Recommend cleaning and painting. <br /> Tank located indoors. <br /> WO 6703819 SEPTEMBER 2016 <br />