My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer ❑ Industry Standard Professional Engineer <br /> L 1 Other(Spec) <br /> Test Method Used: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution:-1/2-30Hg. <br /> Tank#1 Tank#2&3 Tank# Tank# <br /> Is Tank Exempt From Testing?' ❑Yes x No ❑Yes x No ❑Yes No ❑Yes ❑No <br /> Tank Capacity: 12K 12K Split 6/4 <br /> Tank Material: Glass/Steel Glass/Steel <br /> Tank Manufacturer: Modem Welding Modern Welding <br /> Product Stored: Regular 87 Supreme 91/Diesel <br /> Wait time between applying 30 Minutes 30 Minutes <br /> vacuum and starting test: <br /> Test Start Time: 9:45 10:00 <br /> Initial Reading(111): -10 Hg. -10 Hg. <br /> Test End Time: 10:45 11:00 <br /> Final Reading(RF): -10 Hg. -10 Hg. <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Hg. 0 Hg. <br /> Pass/Fail Threshold or Criteria: No loss in Hg. No loss in Hg. <br /> Test Result: X Pass ❑Fail X Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes []No ❑NA X Yes []No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No �NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.