Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 328.01 <br /> Complete the following checklist: <br /> ❑x Yes ❑ No' Is the audible alarm operational? <br /> 0 Yes ❑ No' Is the visual alarm operational? <br /> ❑ Yes ❑ No' Were all sensors visually inspected,functionally tested.and confirmed operational? <br /> Z Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other ecuipment will not inteffere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> 0 N/A <br /> [] Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) ® Sump/Trench <br /> Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0 Yes, ❑ No <br /> ❑ Yes ® No' For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.. no mechanical overfill prevention valve is <br /> ❑ N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so, at what percent of tank capacity <br /> does the alarm trigger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors.probes.or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product, ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> 2 Yes ❑ No' Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 1 li_ <br />