My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 1:41:40 PM
Creation date
5/2/2019 1:23:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`W <br /> Draft Addendum to Revised Work Plan <br /> 1. Introduction <br /> This addendum to the Revised Work Plan and Evaluation of Alternatives for Containment <br /> _ of the Chloroform Plume in Groundwater(Revised Work Plan) has been prepared by <br /> Condor Earth Technologies, Inc. on behalf of Triple E Produce to comply with <br /> provisional acceptance of the Revised Work Plan by the California Regional Water Quality <br /> Control Board (Regional Board) as stated in a letter to Triple E dated 31 July, 1995. The <br /> necessary permits for disposal of the groundwater have been requested from the Regional <br /> Board. The comments from the above mentioned letter are addressed by number below. <br /> 2. Comment 1 <br /> — <br /> "An alternative for remediation at the source area if redevelopment of MW-4A does not <br /> improve the yield from this well." <br /> — <br /> 3. Response 1 <br /> If redevelopment of MW4A does not enable Triple E to sustain a 5 gpm pumping rate, the <br /> maximum attainable pumping rate will be used with upward adjustment of the pumping <br /> rate from the new extraction well, XW-1. This will accomodate the necessary additional <br /> removal of groundwater to contain the plume. <br /> 4. Comment 2 <br /> "More details are needed about construction and development of new extraction well <br /> XW-l. The work plan should include details listed in the attached Items to be Included in <br /> a Site Assessment Work Plan". <br /> r <br /> 5. Response 2 <br /> 5.1 BACKGROUND <br /> _ 5.1.1 Site History <br /> • The site is the Triple E Produce Facility on Linne Road in Tracy. <br /> • Activities conducted at the site include washing and packing fresh tomatoes. <br /> IVLO- <br /> _ CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.