Laserfiche WebLink
`W <br /> Draft Addendum to Revised Work Plan <br /> 1. Introduction <br /> This addendum to the Revised Work Plan and Evaluation of Alternatives for Containment <br /> _ of the Chloroform Plume in Groundwater(Revised Work Plan) has been prepared by <br /> Condor Earth Technologies, Inc. on behalf of Triple E Produce to comply with <br /> provisional acceptance of the Revised Work Plan by the California Regional Water Quality <br /> Control Board (Regional Board) as stated in a letter to Triple E dated 31 July, 1995. The <br /> necessary permits for disposal of the groundwater have been requested from the Regional <br /> Board. The comments from the above mentioned letter are addressed by number below. <br /> 2. Comment 1 <br /> — <br /> "An alternative for remediation at the source area if redevelopment of MW-4A does not <br /> improve the yield from this well." <br /> — <br /> 3. Response 1 <br /> If redevelopment of MW4A does not enable Triple E to sustain a 5 gpm pumping rate, the <br /> maximum attainable pumping rate will be used with upward adjustment of the pumping <br /> rate from the new extraction well, XW-1. This will accomodate the necessary additional <br /> removal of groundwater to contain the plume. <br /> 4. Comment 2 <br /> "More details are needed about construction and development of new extraction well <br /> XW-l. The work plan should include details listed in the attached Items to be Included in <br /> a Site Assessment Work Plan". <br /> r <br /> 5. Response 2 <br /> 5.1 BACKGROUND <br /> _ 5.1.1 Site History <br /> • The site is the Triple E Produce Facility on Linne Road in Tracy. <br /> • Activities conducted at the site include washing and packing fresh tomatoes. <br /> IVLO- <br /> _ CONDOR <br />