My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E ATA. <br /> Corporate Office: <br /> t ,•• 21663 Brian Lane, P.O.Box 3905 <br /> CONDOR EARTH TECHNOLOGIES INC. Sonora, 95370 <br /> (209)5322--0361 • FAX(209) 532-0773 <br /> 5651 N. Pershing Avenue, Suite C-3 <br /> January 11, 1996 Stockton, CA 95207 <br /> (209) 474-1492 • FAX (209)478-1716 <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A CUQt4111GLa AL-ke <br /> Sacramento, CA 95827-3098 <br /> • �� <br /> Attn: Mr. Michael H. Mosbacher, P.E. 86go w Rd- <br /> Project Engineer <br /> RE: REPORT OF WASTE DISCHARGE FOR THE EXPANSION AND UPDATING OF <br /> WASTEWATER AND GROUNDWATER WASTE DISCHARGE REQUIREMENTS <br /> TRIPLE E PRODUCE, TRACY, SAN JOAQUIN COUNTY <br /> Triple E Produce has requested updating of its Waste Discharge Requirements for its existing <br /> wastewater treatment systems and the point of compliance for the wastewater treatment process. <br /> Furthermore, in its letter of November 22, 1995, Triple E confirmed that it wanted separate <br /> Waste Discharge Requirements (WDR) for its packing facility effluent and for its groundwater <br /> extraction project. In view of the fact that a separate WDR was requested for the extracted <br /> groundwater, Triple E provided the $1,200 application fee for such requirements. <br /> In your letter of November 1, 1995, Triple E was asked to provide some additional information <br /> to support its Report of Waste Discharge (ROWD) and its requested WDRs. In response to your <br /> request, Triple E has asked Condor Earth Technologies, Inc. to provide that information <br /> hereupon. <br /> 1. Liquid mass balance data for the disposal of the extracted groundwater is presented in <br /> Table 1 - Monthly Water Balance. The table was prepared using the historical monthly <br /> meteorological information for a 100 year wet season. The table provides data for the <br /> volume of the water stored in the aeration pond, the elevation of the stored water, <br /> percolation volumes, and the balance of treated groundwater required to be pumped to <br /> the spray field. An explanation of the Groundwater Treatment System Water Balance <br /> Table is attached. <br /> 2. As requested, Triple E will use a separate spray field for disposal of any extracted <br /> groundwater coming from the treatment facility. A 16 acre apricot orchard, which is <br /> adjacent to the existing packing plant effluent spray field, will by used for disposal of the <br /> extracted groundwater. <br /> 3. A revised site plan is found in Figure A-1. <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.