My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J 1 INU. , 4 �'ffl , ' <br /> .'F Cr CAL,ronNiA <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARO— <br /> CENTRAL VALLEY REGION <br /> 44.13 ROUTICR ROAn, SUITG A <br /> SACRAMFNIO CA 95827.3098 <br /> P,IONF.. (918) 361 L60U <br /> FAX: (916) 361.5CB6 <br /> 11 March 1992 <br /> Mr. Nathar. Esformes <br /> Triple E Produce Corp. <br /> Post Office Box 239 <br /> Tracy, CA 95378 <br /> REVIEW OF WORK PLAN R NORTHERN EXTENT <br /> ALTERNATIVESO TRIPLE�EPRODUCE, TRACY, SAN YJOAQUINIREMEDIAL ACTION <br /> COUNTY <br /> 1 have reviewed the report entitled "Work Plan for Northern Extent Investiga- <br /> tion and Remedial Action Alternatives" submitted for your facility Triple E <br /> Produce, Inc. in Tracy. Except for the lack <br /> of adeplan schedule <br /> for <br /> eptable. <br /> installation of MW-7 and a remedialplan t <br /> A more definite date for the installation of MW-7 should be arranged with the` <br /> property owners as soon as possible. Please inform us .by 1 April 1992.of the <br /> expected installation date of the well . ` <br /> By 8 April 1992, please submit a remedial action plan which discusses in wore <br /> detail alternative treatment and disposal methods. The plan shall include <br /> selection of the most apprupria'te treatment method for implementation and a <br /> schedule for conducting aquifer tests, permitting, construction of the <br /> treatment facility, and startup of the treatment system. <br /> If you have any questions please call me at (916) 351-5649. <br /> POLLY LOWRY <br /> Associate Engineering Geologist <br /> PAL:mdm <br /> cc: San Joaquin County Health Services, Stockton <br /> Mr. Paul Sundberg, Reston, Escelon • <br /> k;�f�!�i`o i.�• <br />
The URL can be used to link to this page
Your browser does not support the video tag.