Laserfiche WebLink
• Maintaining proper housekeeping around and on the rig at all times. Tools should <br /> be stored in a manner that permits convenient access but also provides for <br /> personnel safety. <br /> • Keep platforms,walkways and scaffolding free of obstructions and excess grease <br /> or oil that could cause a surface to become slick and dangerous. <br /> • Store gasoline only in an approved container that has a spark arrestor. <br /> • Check rig equipment prior to starting work; repair or replace faulty items. <br /> • Handle augers with care. Use proper lifting technique; use a tool hoist if possible. <br /> Stay clear of rotating augers. <br /> • Level and stabilize the drill rig prior to raising the mast. <br /> • Watch for slippery ground when mounting/dismounting the platform. <br /> • Unattended boreholes must be adequately covered. <br /> • Avoid drilling during an electrical storm. <br /> 5.2 Chemical Hazards <br /> It is anticipated that the potential chemical exposure to site personnel should be for short periods <br /> of time (no more than two hours) and the levels of waste oil constituents anticipated are not a <br /> major concern. Additionally, little or no drill cuttings will be generated. Air exposure <br /> monitoring will not be performed during the site investigation <br /> Skin contact with potentially contaminated soil or water will be minimized by wearing personal <br /> protective clothing (as described in Section 7.0). <br /> Ingestion of contaminated materials will be minimized by good personal hygiene during <br /> decontamination(i.e., thoroughly washing face and hands with soap and water before eating or <br /> drinking). <br /> 5.3 Noise Hazards <br /> The primary noise hazard at this site is from the drilling equipment. Previous surveys indicate <br /> that drill rigs may produce continuous and impact noise at or above the PEL. Personnel within <br /> 25 feet of an operating rig shall wear hearing protective devices (either muffs or plugs). <br /> 5.4 Underground Utilities <br /> The project site is currently cleared under an active Underground Service Alert ticket. The <br /> contractor will keep the ticket open until the project is completed. <br /> 5.5 Traffic Hazards <br /> As drilling will be conducted in a parking area with thru-traffic,motor vehicles may be a hazard. <br /> The work area will therefore be coned or barricaded. <br /> A-5 <br />