My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1130
>
3500 - Local Oversight Program
>
PR0544417
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 1:41:17 PM
Creation date
5/2/2019 1:40:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544417
PE
3528
FACILITY_ID
FA0003741
FACILITY_NAME
JIFFY LUBE #598
STREET_NUMBER
1130
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
15120405
CURRENT_STATUS
02
SITE_LOCATION
1130 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.1 Fire and Fire Extinguishers <br /> Type ABC fire extinguishers will be available on-site to contain and extinguish small fires. The <br /> local fire department should be summoned (911) in the event of any fire on site. <br /> 12.2 Communication (Telephones) <br /> A Cellular phone may be available at the site. If a cellular phone is not available, then the SSO <br /> will locate the nearest telephone prior to the start of work,mark it on the site map, and inform <br /> site personnel of its location. A list of emergency numbers will be prominently posted at this <br /> telephone. <br /> 12.3 Incident Report <br /> In the event of an injury or illness, work will be stopped until the SSO and the RHSM have <br /> determined the cause of the incident and have taken the appropriate action. Injury or illness, <br /> regardless of severity,will be reported in the form of an accident report. <br /> 12.4 Operation Shutdown ` <br /> Under certain extreme hazardous situations the on-site geologist, SSO, or;subcontractor's safety <br /> representative may request that drilling or sampling procedures be temporarily suspended while <br /> the underlying hazard is corrected or controlled. The SSO will have ultimate authority for <br /> operations shutdown and restart. <br /> A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.