Laserfiche WebLink
=f°�a�': : ` t SAN JOAQUIN <br /> Environmental Health Department <br /> COUNTY <br /> Greatness grows here . <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPING REPAIR PERMIT <br /> [ ] 1 . Submit all information in triplicate . Answer all questions , leaving no blanks . One copy will be returned <br /> to the applicant with comments . <br /> [ ] 2 . Include a detailed site map on a separate sheet of paper showing all work to be done . Include the <br /> location of the tanks ( s ) , piping , all tank- related appurtenances , streets , adjacent properties ( north toward <br /> the top of the page) , nearby septic tanks , leachfields , water wells , buildings , underground public utility <br /> lines ( including water, sanitary sewer and storm sewer) , and distance of piping from tank to dispensers . <br /> If underground utilities are not included on the site map , you must state in writing that USA Dig will be <br /> contacted prior to excavation activities . <br /> [ ] 3 . Complete pages 3-6 , "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR <br /> PIPING REPAIR PERMIT" . NOTE : If sampling is required , sampling firm shall be an independent third <br /> party from the contractor performinq the work . <br /> [ ] 4 . Complete page 7 , "Authorization to Release" . This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility . <br /> [ ] 5 . Submit a completed " Service Request" form and " Underground Storage Tank Program Fee <br /> Worksheet" . <br /> [ ] 6 . If performing any excavation activities , and the facility is located outside of the city limits , submit a <br /> " Backfill Excavation Certificate " as required by the San Joaquin County Building Department. If a <br /> " Backfill Excavation Certificate " is required by any incorporated areas ( cities ) , submit to the <br /> appropriate City Building Departments , pursuant to the Uniform Building Code STD 70 - 11 . <br /> [ ] 7 . The maximum review time for Plan Review is 15 working days from receipt of the adequately <br /> completed plan . If gross deficiencies are identified , an addendum will be required with a $ 152 . 00 per <br /> hour fee and the review will begin on the date of resubmittal . <br /> [ ] 8 . Advance inspection notice of at least 48 hours is required by the <br /> Environmental Health Department ( EHD ) . <br /> [ ] 9 . Contractor to Provide : Combustible/Flammable gas detector (to verify the Lower Explosive Limit <br /> ( LEL ) atmosphere and oxygen level ) , adequate number(s) and appropriate type ( s ) of fire extinguisher( s ) , <br /> and barriers to secure the area as necessary to minimize traffic and pedestrian interference . It shall be <br /> the project manager' s responsibility for compliance with all health & safety regulations and requirements , <br /> including confined space requirements , which shall be strictly adhered to at all times during the course of <br /> the underground storage tank ( UST) activities . <br /> [ ] 10 . The EHD permit shall be on site during all UST permit- related activities . <br /> [ ] 11 . Any changes in this document shall be approved by the EHD prior to initiating work . All changes to <br /> any work must be described in detail on pages 3 & 4 and be shown on the detailed site map . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468- 3420 1 F 209 464 -0138 1 www. sjcehd . com <br />