My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:34:50 AM
Creation date
5/3/2019 2:18:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J & L Market, 8115 S. EI Dorado St., French Camp, CA 95231 Record ID PR0231563 <br /> 5/30/18 <br /> PHOTO #5 <br /> The designated operator employee training for Erica Romero was last performed on 1/16/17 and was not current. Ms. Romero was the only employee on <br /> site at the start of inspection. <br /> UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING RECORD <br /> Far.by 1 olds.AM berAr--a-k- epprovd ty yew I.oeaJhsardWirm <br /> Aw orin,Chad.- 77de 1!.DW.3.CAL 16 CdbbrWo Coda o/ReQrr1W1~(CCR) <br /> Facility Name: <br /> Facility Site Address: �// 1 S FI o(--IV- City: S c u <br /> Section 2715 of Title 23,California Code of Replaliom,rcqubes that Dttaigoated Uadarground Storage Tank <br /> provide anmigg to facility employees who have responsibilities seaoclated with fie operation andlor malorenan a of <br /> underground storage tank(UST)"ems.'ns tmining crust be provided by July 1,2005,and every 12 movift dwedkr.For <br /> facillty employees hired after July 1,2005,the initial training most be provided within 10 days of the date of hire.At least one <br /> of the facility employees Pr ,during operating hour must have cement training.This training must htclude.but is ttol <br /> limned in,the following items as specified in 23 CCR Seuious 2715(f)(l)and(2): <br /> Q Operation of the UST system in a manner consistent with the facility's Best Management Pracyices; <br /> \The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br /> The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> Name(s)of contact person(e)for emergencies and monitoring equipment alarms; <br /> For facilities mat am not routinely staffed,Iheility employee responsibilities as specified in the training program <br /> approved by the local UST regulatory agency. <br /> 23 CCR§2715(f)(3)requires that a list of employees who have been trained by the Designated Underground Storage Tank <br /> Operasor(s)be maintained on-site,or off-site at a readily-available location 1f auvroved by the local attatcv,and provided to <br /> the local agency upon request Completion of this form will satisfy UST training record keeping requirements.The following <br /> employees have been trained as required by 23 CCR Sections 2715(f)(1)and(2): <br /> EB K N <br /> Training Date Hiro Dater Trainer <br /> 7-x'-16 0 U <br /> -T <br /> KyarFaaal e+�nrnael <br /> liaseffeairiq, <br /> VAN <br /> 1 <br /> Stacy Rivera, REHS Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.