Laserfiche WebLink
S <br /> Work Plan comment V� <br /> Hess Dubois Cleaners page 2 <br /> COMMENTS AND CONDITIONS: (continued) <br /> • A CMT well schematic is required to be submitted for approval <br /> before the well permit can be issued. The scaled drawing should <br /> clearly show the number of 6" mesh screens to be installed per <br /> hydrological unit. The depth to the top of screen, top and bottom of <br /> the sand interval, as well as the interval of the bentonite should also <br /> be clearly shown and, <br /> • EHD well permit applications and fees per parcel and offsite private <br /> access and/or municipal encroachment permit copies are to be <br /> submitted after the well schematic is approved by EHD. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN rH&S 25299.37 <br /> subd(c)(3)1: <br /> • none. <br /> DATED: May 21, 2003. BY: s6�� <br /> (rec'd 5-16-03) Michael Infurna, enio EHS (209) 468-3454 <br /> [ X ] Faxed to consultant on: <br /> t <br /> i <br /> i <br /> P <br /> j <br /> i <br />