My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002678
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
300
>
3500 - Local Oversight Program
>
PR0544424
>
ARCHIVED REPORTS XR0002678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:56:58 AM
Creation date
5/6/2019 11:26:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002678
RECORD_ID
PR0544424
PE
3529
FACILITY_ID
FA0005099
FACILITY_NAME
HESS DUBOIS CLEANERS
STREET_NUMBER
300
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
300 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f2. ! r f <br /> a ir� ,s y ! . t �! ` NS „I I F .+ � * '• :. " ,' ! i t•• Sa E i , ri] <br /> 7=November:1995 rr + i ,,; �kl <br /> ^!,l; AGE NC:Proiect No: 95 0,114 <br /> fiPage S of 6 `: t: .. , • <br /> } 14 Decontaminate sampling equipment in'An alconok solution-arid rinse twice with water prior' <br /> to each sampling run.,,- , <br /> 15. `Steam-clean auger flights-after.drilling each soil bormg'or monitoring well, ,. <br /> 4.2..' , BARING GOMPLETIONAND WELL ABANDONMENT <br /> For completion of the�soil borings/monitoring`wells;the,foilawing.proced 're ' - ill',be performed: <br /> l Complete all monitoring wells in,accordance.withthe well design illustrated in•Figure.3 <br /> Y 2: In the event four borings are required,-the excess boring will be back filed using a <br /> concrete-bentonite.slurry in-the entire depth•of the boring., . <br /> 3. Pressure grout MW-3'to the surface with Portland'cenient. <br /> 4. Over drill the upper_three feet and'fill the well with native soil to surface grade. .T. <br /> ' 5: . ' Survey.and develop each new monitoring well. Each new.well will be surveyed relative to . ;=i <br /> existing monitoring.wells. Ill <br /> .4.3. GROUND WATER SAMPLE COLLECTION <br /> Upon-completion of diilling, 'ground water,samples-will be collected from each well. The.following ' ` <br /> procedures will,be performed: <br /> 1. No,sooner than 48 hours after installation, measure to the nearest 0:01 •foot, the static'water,• <br /> level in the new wells.' - <br /> 2. Using a.bailer or,submersible pump, surge and,purge•all•wells.'Each=well will be•purged'.of' <br /> ' standing water to stabilize ternperature, ph and, conductivity. Well , parameters .will be, ;! <br /> measured atone-gallon intervals. Xniin mum of three well volumes of water will be,re rioved <br /> from each well. <br /> 3.. After stabilization, collect one ground water sample from each well: Samples will collected <br /> in'EPA 40-ml vials. Each'sample will be collected using anew disposable bailer. <br /> ' . 4. -' Transport ground wat'e'r saniples,under' chain-of custody to, a state-certified-labora tory`foi <br /> analysis. Ground water samples will.be analyzed for TPH=ss and BTE&X in accordance with <br /> EPA methods.GCFID/5030 and 602,'respectively: <br />
The URL can be used to link to this page
Your browser does not support the video tag.