My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002679
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
300
>
3500 - Local Oversight Program
>
PR0544424
>
ARCHIVED REPORTS XR0002679
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:59:42 AM
Creation date
5/6/2019 11:27:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002679
RECORD_ID
PR0544424
PE
3529
FACILITY_ID
FA0005099
FACILITY_NAME
HESS DUBOIS CLEANERS
STREET_NUMBER
300
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
300 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
✓ i �� lurl � . ' <br /> TABLE 1 <br /> UNDERGROUND STORAGE TANKS <br /> Hess-DuBois Cleaners <br /> 348 West Harding Way, Stockton, California <br /> Tank Identification Volume (Gallons) Product <br /> Tank #1 2000 Stoddard Solvent <br /> Tank #2 1800 Stoddard Solvent <br /> Tank #3 2000 Stoddard Solvent <br /> Tank #4 500 Stoddard Solvent <br /> Tank #5 1370 Stoddard Solvent <br /> Tank #6 5000 Stoddard Solvent <br /> Tank #7 500 Stoddard Solvent <br /> Tank #S 500 Stoddard Solvent <br /> A. <br /> . 2.3 Site Assessment <br /> Three groundwate-r monitoring wells (MW-1, MW-2 and MSG'-3) were installed at the sire <br /> on October 26, 1993. The monitoring well locations are illustrated in Figure-2. <br /> No TP:I-1 or BTE&X weI'e detected iaz samples from MW-1 or MW-2. However, TPl-i Was <br /> detected in the soil boring completed as MW-3 at concentrations up to 2,000 ppm. Toluene, <br /> ethlybenzene and xylene were also detected in soil samples from MW-3 at concentrations <br /> up to 51 ppm. <br /> Groundwater samples were collected from each well in November 1993, June 1994 and <br /> September 1994. TPH as Stoddard Solvent, ethylbenzene and xylenes have beeii detected <br /> in all three monitoring wells during each sampling event; Benzene has been detected only <br /> in samples from MW-1 and MW-2. <br /> 2.4 Groundwater Depth and Flow Direction <br /> Since installation of the three monitoring wells, depth to groundwater has averaged 42.43 <br /> feet. Since January 1994, the groundwater flow direction has remained between N 5° E and <br /> N43 ° W. <br /> 0r04,,I Audit 4 <br /> Sr WPU12.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.