Laserfiche WebLink
I, .0V I), <br /> r ..,f. '' - - , y. , .h 1- ; - !�E-� r Y o •I S '�I} 1 g s!� �, k <br /> , •' I s s � r H j , I i + � ilhi'1 i I :� <br /> 4 ,, „ Y l 1 t L d' � V ] ° i I ' 1 11 {I ��0•��t , �.1 A.. <br /> • ., , x i r ! >. 7 'yI'16 -{ ✓ s MI+ � Ude ,{ell , <br /> *u'- •} i. ,I r -L 1 ° 1 I 1+� Iq rI'„ <br /> I• ;,. <br /> Quarterly''Report <br /> T4,4'9,uarter 200.0 �,'+,'" k,° I" <br /> .F6rm&r•HE_ SS De�BOIS GLEANERS ' <br /> °j <br /> 348 West Harding'W <br /> Stockton;California <br /> •t •' ! , - try r .: r 1 �' {_ + ' <br /> INTRODUCTION'AND SCOPE OF WORK <br /> At the request;of Mr..Peter Wallace, property owner;Advanced Geo`Environt`nental, ML(AGE) hast <br /> prepared, this Quarterly- Report detailing field activities' at .3.48. West Harding',,Way, Stockton; <br /> 4 Califo: ia'(the site} during'the first quarter of 2000. 3 z <br /> { ; <br /> The scope of work completed during the'quarter`iiicluded the'installation bof two;additional ground' <br /> water monitoring wells; advancement of two soil borings,"and monitoring and sayofi0g:of seven on I' <br /> and off-site' wells in January 2000.The site setting is illustrated in Figure"1:' Thealocations of+ ` <br /> structures and monitoring wells.on and near the,site aredepicted iii Figure 2: .. <br /> 2.0. ..,PROCEDURES H <br /> .Field activities at the sitq were performed in"accordance with guidelines for the subsurface <br /> investigation of.underground.storage tank (UST) sites esiablished'by the Central,Valley Regional <br /> Water'Quality Control Board-(CVRWQCB) and by the"San Joaquin County Public He'alt�a Services <br /> . Environmental Health Division (PHS-EHD).' .1 <br /> 2.1. DRILLING.AND SAMPLING <br />:11 In January 2000, four soil borings were advanced,at the site. Three soil borings SBI and <br /> SB2) were advanced using a CME-75,drill rig, equipped.with 8.25-inch.diameter hollow-stem ; <br /> augers. One soil boring(MW=7)was advanced using a CME HT75 Limited''..access drill•rig equippeld <br /> with 8.25-inch diameter hollow-stem augers. The drill rigs and,two-man crew were supplied by West '., <br /> Haz Mat Drilling.'Auger' returns 'gener'ated,by''drilling are.-stored'on=site on visqueen; pendang;r`, <br /> laboratory analysis'.' i <br /> Soil samples were collected ahead of the drrll bit,usmg'a Cahforma mod<fied split-tube sampler <br /> loaded With three pre-cleaned 2-inch by 6-inch brass sleeves. The samples were collected'frol <br /> `monitoring well pilot boring MW-7 and•.borings SBI and SB2,'at five-foot intervals, beginning <br /> 5 feet bsg='using a 140-pound hammer to,advance the sampler 18.inches..The number,of blows <br /> required to advanc&the sampler,in 6-inch increments was recorded'ori,the Boring logs. Sampling <br /> '. eq>_iipmcnt was washed-iri an Alc'6nox solution and rinsed with water pnOr,to,each sampling run to•� <br /> avoid cross-contamination. Samples were not collected from monitoring well"'pilot'b ring MW6''''' , <br /> (See Appendix A). ; <br /> „Advanced GeoEnvironmcntal,Inc.^I;, <br /> • ' :. _ - r r - 1 .- V'13 -1 .'!,1 i I ' , kL, <br />