My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002703
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
300
>
3500 - Local Oversight Program
>
PR0544424
>
ARCHIVED REPORTS XR0002703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 10:26:50 AM
Creation date
5/6/2019 11:47:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002703
RECORD_ID
PR0544424
PE
3529
FACILITY_ID
FA0005099
FACILITY_NAME
HESS DUBOIS CLEANERS
STREET_NUMBER
300
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
300 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SPECIFIC HEALTH AND SAFETY PLAN <br /> 1. INTRODUCTION <br /> This document describes the health and safety procedures for the <br /> activities planned in performing an Environmental Investigation <br /> caused by the Underground Storage Tank (UST) removal at 348 W. <br /> Harding _ Way, Stockton, California. All personnel and <br /> subcontractors will follow this plan. The prime responsibility for <br /> employee safety lies with each company that is involved in the work <br /> for it' s own employees. It is expressly intended that all project <br /> work will comply with applicable sections of the California <br /> Occupational Health and Safety code. All parties working on this <br /> project will maintain a general responsibility to identify and <br /> correct any health and safety hazards and are responsible for <br /> working in a safe manner. All personnel, workers or visitors, will <br /> read and sign this document prior to coming on site. <br /> 2 . PERSONNEL RESPONSIBILITY <br /> Project personnel who will have overall responsibility for the safe <br /> operation of this are: <br /> Site Contact: John N. Alt, CEG. (510) 791-1986 <br /> Project Manager: John P. Cummings <br /> Site Safety Officer: John P. Cummings <br /> 2. 1 Project Manager and Safety Officer Responsibilities: <br /> * To conduct initial site safety training for all project <br /> field personnel as described in this document and <br /> ascertain that field personnel have the appropriate OSHA <br /> approved training and medical surveillance per 29 CFR <br /> 1910. 120 <br /> * To assure all field personnel have read, understand and <br /> signed the Health and Safety Plan <br /> * To assure that all work performed on this project is <br /> conducted in a safe manner <br /> . * To coordinate with field personnel fire-watch, traffic <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.