My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2900 - Site Mitigation Program
>
PR0506390
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 1:28:20 PM
Creation date
5/6/2019 1:24:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506390
PE
2950
FACILITY_ID
FA0007389
FACILITY_NAME
MINI STOP
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I') November -'1000 <br /> AGE-NC Project No. 98-0501 <br /> Page 9 o f 10 <br /> 4.4?. Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling, the well will be purged using <br /> a submersible pump to ensure that the ground water sample is representative of the formation, rather <br /> than water standing in the well casing. The well will be purged until: 1) a minimum of three casing <br /> volumes is removed from the well, and/or ?) the Field-measured ground water parameters pH. <br /> temperature and electrical conductivity have stabilized. However.. if'a well is purged dry prior to <br /> evacuating three casing volumes, a ground water sample will be collected following 80 percent <br /> recovery of ground water level within the well or within 8-hours of well evacuation. <br /> Purge water, free-product, and decontamination wafter generated during the ground water sampling <br /> activities will be contained in DOT-approved drums which will be appropriately labeled for storage. <br /> Drums containing purge water will be stored on-site pending appropriate removal and disposal. <br /> 4.4.3. Sample Withdrawal <br /> Water samples will be collected from the; monitoring wells using disposable polyethylene bailer. <br /> These bailers are disposed of after one use and require no decontaminating,thereby minimizing cross <br /> contamination due to sampling devices. Samples will be drawn and collected in such a manner that <br /> agitation and exposure of the ground water to the atmosphere is minimal. Sample containers will be <br /> filled using the appropriate disposable sampling attachment which allows controlled flow out of the <br /> bottom of the bailer by lifting up on the check valve. <br /> 4.4.4. Sample Handling <br /> Ground water samples will be collected into laboratory supplied containers. Ground water samples <br /> to be analyzed for '[PH-g, BTEX and fuel additives will be collected into 40-m1 volatile organic <br /> arialvsis (VOA.) vials containing 0.5-m1 of hydrochloric acid as preservative. Following collection, <br /> the samples will be placed on lee and kept in a cooler until delivered to the laboratory for analysis. <br /> Chain-of-custody protocols will be used to document sample custody transfer from the field to the <br /> analytical laboratory. A chain-of-custody Lorin will accompany the samples. <br /> 4.5. EQUIPMENT DKONTAMINATION/WASTE MANAGEMEN-r <br /> All sampling tools used for Sample collection, except for disposable bailers. will be thoroughly <br /> rinsed with clean water after being washed with a solution of Alconox. All down-hole drilling <br /> equipment will be pressure washed prior to starting each boring. <br /> .4dranced GeoEnvirOFIMCHNI,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.