Laserfiche WebLink
Nqw- 140-11 <br /> FAST & EASY MART <br /> �- 244 West Harding Way, Stockton, California <br /> Soil Testing Work Plan <br /> 1.0 PROJECT IDENTIFICATION <br /> This project will involve two soil borings, with laboratory sampling, in the vicinity of the <br /> underground fuel tanks at the Fast & Easy Mart. Both soil and groundwater will be <br /> sampled and analyzed to determine if a significant release of petroleum has occurred at <br /> this site. <br /> 2.0 WORK PLAN <br /> Two soil borings to obtain laboratory soil and groundwater samples have been proposed <br /> as an environmental assessment for a property transaction at this site. The borings shall be <br /> located near the fill pipes and fuel pumps and will be drilled to groundwater (Figure 2). <br /> Soil samples will be collected at five foot intervals for geological interpretation and <br /> laboratory analysis (2 laboratory soil samples per boring). One of the soil samples will be <br /> obtained from the capillary zone <br /> Water samples will be obtained through a temporary (stainless steel) well casing inserted <br /> through the bore hole. <br /> A report of the subsurface investigation containing site map, boring logs, and soil and <br /> �.. groundwater sampling records with laboratory data sheets will be prepared at the end of <br /> this phase of work. All work will be conducted under the direct supervision of a licensed <br /> professional. <br /> 2.1 Drilling <br /> Permits will be obtained, as necessary, for the borings before drilling begins. The <br /> soil boring will be accomplished using a mobile mounted drilling rig employing <br /> the use of a hollow stem flight auger no less than 3 1/4-inch i.d. and 8 7/8 o.d. <br />