Laserfiche WebLink
FAST& EASY MARS .., <br /> Soil Testing Work Plan <br /> Page: 3 <br /> 2.3 Groundwater Sampling <br /> A travel blank, provided by the laboratory, will accompany the sample vials from <br /> the time they are picked up from the lab to the time they are delivered to the lab. <br /> This travel blank will be listed on the Chain of Custody, but will be analyzed only <br /> if all samples contained the same contaminants. <br /> All sampling equipment, including the stainless steel well casing used by sampling <br /> personnel will be disassembled and steam cleaned prior to commencement of <br /> sampling. These procedures will also be followed between each boring. <br /> The groundwater samples will be analyzed or extracted within 14 days according <br /> to their EPA methods. The samples shall be analyzed for Total Petroleum <br /> Hydrocarbons (gasoline), BTX&E (Benzene, Toluene, Xylene, and Ethyl <br /> Benzene) and MTBE (Methyl tert-Butyl Ether). Analysis will he conducted by <br /> GeoAnalytical Laboratories. <br /> Prepared By: <br /> ,,#!�j�A„., <br /> -•..f e ?Y <br /> t/ �`, c gee;• �..`�`�� <br /> Michael J. Kloberdanz, REA, RE <br /> California Registered. Environmental Assessor#02157 °; •g <br /> °" California Registered Environmental Health Specialist #4783 , <br />