Laserfiche WebLink
Wll'F Environmental Consultants, Inc. <br /> Sarnplirg PratocoIs <br /> Page. <br /> The cuttings from the drilling operation will be containerized on-site during;drilling <br /> for proper, disposition. The proper method of disposal will be dependent upon <br /> results of laboratory analysis. this disposal will be the responsibility of tie client <br /> M. unless other arrangements have been n±ade. <br /> Well Construction <br /> All materials used in well construction will be thoroughly cleaned prior to <br /> introduction into the boring. A bentonite or cement and bentonite grout will be <br /> placed at the bottom of the boring as necessary.ae1! fta two-inch diameter has been a;fowed ell casi�g <br /> — se:long enough to support the Weight <br /> (stainless steel or PVC) with end cap and factory perforations for placemei:t in the <br /> saturated zone(taking <br /> into account seasonal variation)will be placed in the boring. <br /> —• <br /> Tile screen and filter pack sizes wit be as noted in the well construct"so±t drawing. <br /> The casing and end caps will be threaded or joined by stainless str4 screws, no <br /> PVC cement will be used. Toot lee fepee I <br /> t tilick will be placed in textend two feet he a�uzularr space ta <br /> zone. A bentonite seal two t <br /> above the filter pack followed by a cement grout to the surface. Seal and filter <br /> pack elevations may change based on the underlying geology, <br /> 'Velj Development and SamPlina <br /> The well will be developed until the well <br /> ased water <br /> nthe judgempears rof ent of the responsible <br /> iment of until an <br /> appropriate number of well volumes(b upon well development <br /> professional) have been evacuated. The water produced during <br /> will be containerized and left on-site in 55-gallon drums n receipt of lor other aboratory <br /> for <br /> Hers <br /> for disposal as hazardous waste if deemed necessary , <br /> results. Disposal will be the responsibility of the client unless other arrangements <br /> have been made. <br /> All soil and ground water samples will be properly labeled with date collected <br /> project number, sample coordinator, and sample identification.ellAlll samples <br /> Field <br /> will be <br /> identified with job number-year-borehole-depth) <br /> records will document the above information and other significant data such as <br /> names of on-site personnel. sampling methods, datand erre atives added(if any), <br /> _-.._. number of well volumes rcmovcd befn.e sampling, <br /> -- ---- <br /> erforiried on-sa;na e . ----. __._..- --..-------- -- ------._..---- -..------ <br /> and any filtration p <br />