Laserfiche WebLink
Project No. 90161a,e <br /> r 7 .lune 1990 <br /> 6" BORING No. 5 <br /> LOGGED BY INIC _DATE DRILLED—. 61 k L90 _ BORL�G•DIAI,STER <br /> Fs MISC. <br /> '9g� c. w � LAB <br /> SOIL DESCRIPTION � 2 �� �� �� RESULTS.�, Z. ..s aR <br /> �" to =U m ra O <br /> P <br /> Tank Removal Location <br /> Asphalt <br /> Gravel <br /> I SM <br /> Brown clayey silty SAND, moist, loose <br /> 2 Fill Material <br /> - 3 <br /> 4 TEST BORING TERMINATED AT 3 FEET <br /> On Pipe <br /> 5 <br /> l'4 <br /> 6 <br /> 7 7 <br /> .T <br /> to- <br /> LI <br /> lZ <br /> • .v <br /> 1 <br /> 15- <br /> IT I <br /> j <br /> l � <br /> — - i <br /> 19 <br /> 2 <br /> FIGURE NO. 6 LOG OF TEST BORINGS <br /> YOUNTGDAhE I, <br />