My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
140
>
3500 - Local Oversight Program
>
PR0544425
>
ARCHIVED REPORTS XR0012718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 3:04:54 PM
Creation date
5/6/2019 2:45:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012718
RECORD_ID
PR0544425
PE
3528
FACILITY_ID
FA0006249
FACILITY_NAME
VILLAGE PROPERTIES
STREET_NUMBER
140
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13707051
CURRENT_STATUS
02
SITE_LOCATION
140 HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 90161.e <br /> 7 June 1990 <br /> CHECKLIST OF RECOMENDED SERVICES <br /> Not <br /> Item Description Recommended Anticipated <br /> 1. Provide foundation design parameters. Included <br /> 2. Review grading plans and specifications. X <br /> 3. Review foundation plans and specifications. X <br /> 4. Observe and provide recommendations <br /> >� <br /> regarding-demolition. X <br /> 5. Observe and provide recommendations <br /> regarding site stripping. X <br /> 6. Observe and provide recommendations on <br /> moisture conditioning, removal, and/or <br /> precompaction of unsuitable existing soils. X <br /> 7. Observe and provide recommendation on the <br /> installation of subdrain facilities. X <br /> 8. observe and provide testing services on <br /> fill areas and/or imported Fall materials. X <br /> 9. Review as-graded plans and provide additional <br /> foundation recommendations, if necessary. X <br /> 10. Observe and provide compaction tests on <br /> sanitary sewers, storm drains, water lines <br /> and utility trenches. X <br /> 11. observe foundation excavations and provide <br /> supplemental recommendations, if necessary, <br /> prior to placing concrete. X <br /> 12. Observe and provide moisture conditioning <br /> recommendations for foundation areas prior <br /> to placing concrete. X <br /> 13. Provide design parameters for retaining <br /> walls. Included <br /> 14. Provide finish grading and drainage <br /> recommendations. Included <br /> 15. Provide geologic observations and <br /> recommendations for keyway excavations <br /> and cut slopes during grading. X <br /> 16. Excavate and recompact all test pits, <br /> 4� within structural areas. X <br /> 20 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.