Laserfiche WebLink
t <br /> TABLE OF CONTENTS <br /> Page <br /> 1' <br /> 1.0 INTRODUCTION 1 <br /> 2.0 BACKGROUND 1 <br /> 2.1 Initial Investigations, 1990 - 1993 1 <br /> 2.2 Additional Investigation, August 1993 4- <br /> 2.3 Additional Groundwater Investigation 4 <br /> 3.0 PROCEDURES 5 <br /> 1 <br /> 3.1 Monitoring Well Installation 5 <br /> ' 3.2 Depth to Groundwater 5 <br /> 3.3 Monitoring Well Purge Procedures 7 <br /> 3.4 Groundwater Sample Collection and Analysis 7 <br /> 3.5 Drum Sampling 7 <br /> 1 4.0 FINDINGS 7 <br /> 4.1 Soil Sample Analysis 7 <br /> 1' 4.2 Groundwater Depth and Flow Direction 8 <br /> 4.3 Groundwater Sample Analysis 8 <br /> 4.4 Analytical Results of Drum Sampling 11 <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS 11 <br /> I' 5.1 Petroleum Hydrocarbon Impacted Soil 11 <br /> 5.2 Petroleum Hydrocarbon Impacted Groundwater 13 <br /> 5.3 Drums and Stockpile Soil Sampling 13 <br /> 5.4 Site Closure 14 <br /> 1 <br /> 6.0 LIMITATIONS 14 <br /> 11 <br />