Laserfiche WebLink
i <br /> .__.....................----- ........:_.._....... . <br /> • A purge rate should be selected as to stabilize drawdown. If the well is able to sustain a 0.5 <br /> gallon per minute(gpm)purge rate,then once temperature,pH,and specific conductance <br /> parameters-have stabilized,as listed above,well purging-is considered complete. All purge <br /> rates and volumes removed will be recorded on Groundwater Sampling Logs. <br /> • If the well is unable to sustain a 0.5 gpm purge rate and-the well is pumped dry,then <br /> groundwater samples will be collected oncethewell has recovered a sufficient amount of <br /> water.to bail. A disposable or properly decontaminated TeflonTM bailer should be used to <br /> sample. If the well is purged dry a note will.be recorded on the Groundwater Sampling Log. <br /> Techniques for conventional/modified well purging include: <br /> • Acceptable purge/sampling devices for this project shall be submersible positive- <br /> displacement type pumps,bailers,and bladder pumps for.purging and sampling. It is <br /> recommended to purge and sample at similar rates. <br /> • Purging should be accomplished with as minimal disturbance to the surrounding formation as <br /> _. possible. _ <br /> • Purge water is containerized on-site and stored as directed by.the Project Manager. <br /> The following formula may be used to determine the volume of any well: <br /> V = 5.875xCZxH <br /> where: V=volume in gallons <br /> C=casing diameter, in feet <br /> H=height of water column,in feet <br /> Using this formula,the volume per Iinear foot of well casing of common casing sizes is listed <br /> below: <br /> i <br /> Casing Diameter Volume per <br /> inches Linear Foot(gallons) <br /> 1.5" 0:092 <br /> 2.0" '0:163 <br /> 4A" 0:563 <br /> 6.0" 1.469 <br /> Well Sampling <br /> After purging has been completed groundwater samples should be collected either directly from <br /> the new or properly decontaminated pump tubing or from a disposable or properly <br /> decontaminated TeflonT9 bailer equipped with a bottom-emptying device. Appropriate <br /> gw sampling.SOP Page 3 of.5 February 2005 <br /> i <br /> I <br />