Laserfiche WebLink
Jeffery Wong <br /> Tma&%%A1&Rd10 <br /> San Joaquin County Environmental Division <br /> 23 December 2003 <br /> Page 3 <br /> i <br /> All soil, groundwater and decontamination water generated during this scope of work will be <br /> stored on site in drums pending analytical results. All borings will be closed by pressure <br /> grouting in accordance with the requirements of San Joaquin County. <br /> SCHEDULE <br /> Above ground demolition(down to building foundations) is scheduled to begin during the third <br /> or fourth week of January 2004. We would like to proceed with the site investigation prior to <br /> 15 January 2003. If you have any questions regarding this workplan please call. <br /> Sincerely yours, <br /> TREADWELL &ROLLO, INC. <br /> f' D <br /> Nd' '.'. 7066 <br /> David G. Dixon, G Philip G. Smith, REA II, CPGS <br /> Senior Project Manager •. �'� �� Principal <br /> 25971005.DGD OF Cp`,'�� <br /> I <br /> Attachments: Figure 1 —Site Plan <br /> Boring Permit Application <br /> Encroachment Permit <br /> cc: Lorraine Islas; City of Stockton Mayors Office <br /> Kitty Walker, Stockton Housing and Redevelopment Department <br /> i <br /> I <br /> j <br /> I <br /> I <br />