My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8925
>
2800 - Aboveground Petroleum Storage Program
>
PR0528878
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 10:15:32 AM
Creation date
5/6/2019 4:28:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528878
PE
2832
FACILITY_ID
FA0017954
FACILITY_NAME
RAMOS OIL CARD LOCK
STREET_NUMBER
8925
Direction
W
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00120078
CURRENT_STATUS
01
SITE_LOCATION
8925 W THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramos Oil Co- 8925 W Thornton Rd <br /> May 10, 2017 Inspection Violations <br /> Violation 201-Ramos Oil was working on SPCC contingencies. (See attached certified SPCC) <br /> Violation 618-Weekly and monthly inspections are conducted according to those outlined in the SPCC. <br /> Tanks are double-walled and exempt(we believe)from integrity testing described in STI SP001. <br /> Violation 619-Personnel is trained annually on discharge prevention as part of the SPCC training. (See <br /> attached training log and outline) <br /> Violation 622-Spill prevention briefing is conducted as part of the SPCC training. (See attached training <br /> log and outline.) <br /> Violation 710-Visual inspections are conducted weekly and monthly per SPCC. <br /> Violation 715-Liquid level sensors previously tested by in-house maintenance crew. Beginning lune <br /> 2018 liquid level sensors will be tested by third-part test agent Tanknology,annually thereafter. <br /> Violation 718-55 gallon new oil and liquid waste drums are stored in lock cinderblock enclosure with <br /> the perimeter lined with 3.5"oil absorbent boom. <br /> Violation 723-Aboveground valves,piping,and appurtenances are inspected as part of the weekly and <br /> monthly SPCC inspections. <br /> Violation 724-No work has been performed since its construction at which point Filner Construction <br /> would have performed pre and post hydrostatic integrity testing on the lines. We do not have those <br /> records,however piping at this facility has secondary containment and is continuously monitored. <br />
The URL can be used to link to this page
Your browser does not support the video tag.