Laserfiche WebLink
r^� <br /> J <br /> J <br /> 2.0 SITE DESCRIPTION _ `J <br /> The Site is part of the Banner Island Redevelopment Project, which includes the area north of the <br /> Stockton Channel bounded by North Lincoln Street to the west, West Fremont Street:to the north and <br /> Commerce Street to the east(Figure 1). Environmental issues associated with the48nner Island Project <br /> are being overseen by the California Department of Toxic Substances Control (DTS.C). The SJCEHD is <br /> continuing to oversee four areas with UST releases at the Banner Island Project, including the adjacent <br /> Carando Site, under their local oversight program (LOP). => <br /> Until March 2004, the Site was occupied by several buildings. During March 2004, We buildings were <br /> demolished in preparation for redevelopment. Prior to the City's purchase, the Site-had been vacant for <br /> several years and had previously been operated as an auto repair facility for Chase.Chevrolet. This site was <br /> originally developed in the early 1900s and re-developed sometime in the 1950s for use as an auto repair <br /> facility. Areas between buildings are mostly unpaved; however, there are some areas which are paved or <br /> covered with concrete slabs. UST remediation activities have taken place at the Site,since the late 1980's. <br /> The Site is enrolled in the State Underground Storage Tank cleanup fund. <br /> J <br /> 3.0 PROJECT ORGANIZTION AND DESCRIPTION OF TASKS <br /> 3.1 Project Organization <br /> The following summarizes the project contacts, client, Treadwell & Rollo project personnel and <br /> subcontractors associated with the project. A description of responsibilities for Treadwell & Rollo <br /> personnel are described in Section 3.3. <br /> .J <br /> 2 <br /> HEAL Th'&SAFETY PLAN 2597.11 HASP-2 ver arse.doc <br /> TREADWELL&ROLLO, INC. <br /> �J <br />