Laserfiche WebLink
` a <br /> water'work Corporation <br /> Quali Assurance and Quay Control Plan <br /> The Remedial Investigation (RI) Quality Assurance/Quality Control <br /> (QA/QC) program is intended to facilitate the acquisition of <br /> accurate and reliable data. Environmental data gathered during <br /> the RI will be collected and analyzed following procedures <br /> prescribed in the Quality Control Program. A Quality Assurance <br /> Program has been established to assure that the Quality Control <br /> Program is effective. Both programs are necessary to provide ; <br /> accurate data and documentation for investigations an res wrltory <br /> analyses. The following field and laboratory p <br /> l he <br /> implemented to ensure that QA/QC objectives are met. <br /> 1.0 Recording of Field Data <br /> All information pertinent to the field investigation will be <br /> kept in a field log book. Information to be documented <br /> Includes at least the following: <br /> - Sample numbers <br /> - Locations of sample collection <br /> - Soil boring or well numbers, as applicable <br /> - Depths at which samples were obtained <br /> - Names of collectors <br /> - Dates and times of collection <br /> - Purpose of sample <br /> - Sample distribution (e.g., laboratory, archive, etc. ) <br /> - Field observations <br /> - Field measurements (e.g. , PID readings, pH, <br /> conductivity, water levels). <br /> - Other data records (e.g. development log, soil sampling <br /> report, well log, etc. ) <br /> 2.0 Sample Containers <br /> Groundwater samples will be placed in containers supplied by <br /> the analytical laboratory. Table 1 summarizes -;he required <br /> sample containers. <br />