My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012572
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
423
>
3500 - Local Oversight Program
>
PR0544427
>
ARCHIVED REPORTS XR0012572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 9:22:25 AM
Creation date
5/7/2019 8:33:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012572
RECORD_ID
PR0544427
PE
3528
FACILITY_ID
FA0004581
FACILITY_NAME
CHASE CHEVROLET*
STREET_NUMBER
423
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
423 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E- ! <br /> E MAI <br /> A - <br /> Volume of Open Borehole and Annular Space <br /> Between Casing and Hole <br /> Volume/ Volume/ <br /> Hole linear ft. Nominal linear ft. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> (inches) Gal. Cu. ft. (inches) Gal. Cu. Ft. <br /> -7.25 2.14 0.29 2 1.91 0,26 <br /> 8.25 2.78 0.37 <br /> 2 2.55 0.34 <br /> 10.25 4.29 0.57 <br /> 2 4.06 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12,25 6.13 0.82 <br /> 4 5.30 0.71 <br /> *Note: Annular volumes will be multiplied by 30% to account for <br /> porosity of filter pack. <br /> if the aquifer is slow to recharge, d,,velopment will <br /> continue until recharge is too slag to practically continue. <br /> The volume of water produced versus time will be recorded. <br /> All withdrawn groundwater will be stored on-site in 55 <br /> gallon waste drums unless permission is granted by the <br /> appropriate regulatory agency to discharge the water to the <br /> ground surface or sanitary sewer. Drummed water will be <br /> labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 11.0 soil Sampling Protocol <br /> 11.1 Sample Collection During Drilling Activities <br /> A proposal will be submitted to the lead Regulatory <br /> Authority with proposed boring/sampling locations. The <br /> exact <br /> determied location borings <br /> in the field by the Project Geologist/Engineer.be <br /> Prior to arriving at the sample site, the drill rig/augers <br /> will be steam cleaned and all sample equipment will by <br /> cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> soil samples will be obtained using a California modified <br /> split-sfpoon sampler containing three, six inch long, two <br /> inch diameter brass tubes. The sampler will be driven 18 <br /> inches ahead of ti:e hollow stem auger by a 140 pound hammer <br /> with a 30 inch drop in accordance with American Society fg]r <br />
The URL can be used to link to this page
Your browser does not support the video tag.