Laserfiche WebLink
13 April 1998 <br /> �. AGE-NC Project No 95-4144 <br /> Page 4 of 4 <br /> • Further assessment was performed in the former area of UST No 8 in December 1997 and <br /> ' summarized in the Site Investigation Report - UST No 8 prepared by AGE A work plan <br /> should be prepared for the installation of additional monitoring wells in the vicinity of <br /> former UST No 8, as recommended in the referenced report <br /> 1 • The next quarterly monitoring event should be scheduled for May 1998, concurrent with <br /> monitoring at the Van Buren site <br /> 1 6 0., LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic ' <br /> conditions at the site have been made from a limited number of available data points {l e ground <br /> ' water monitoring wells}, and subsurface conditions may vary through time and with distance from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> , <br /> r <br /> r <br /> ' Adtanced Geo£nvironmental,Inc <br /> s <br /> k , 7 <br /> s <br />