Laserfiche WebLink
r 04 April 2001 <br /> AGE-NC Project No 95-0144 <br /> Page 9 of 9 <br /> 5.0 RECOMMENDATIONS <br /> Based upon data obtained during the second quarter of 2000 and previous sampling events, AGE <br /> recommends <br /> • Continued quarterly monitoring of the site The next quarterly monrtormg event should be <br /> scheduled for March 2000, concurrent with monitoring at the Van Buren site In accordance <br /> with the revised monitoring schedule, monitoring wells MW-1, MW-2, MW-4, MW-13, <br /> MW-19A &B, MW-20A & B and MW-21A& B will be sampled at that time <br /> • <br /> Implementation of the work plan submitted to the PHS-EHD for remediation at the former <br /> UST No 1 location and for feasibility testing at the former UST No 8 location upon <br /> ' regulatory agency approval <br /> • Preparation of a work plan to further define the source and possible migration pathways of <br /> contamination In the northwest portion of the site <br /> 6.0. LIMITATIONS <br /> b <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> ' environmental consultants practicing in this or sunmlar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologmc <br /> conditions at the site have been made from a limited number of available data points (I a soil <br /> samples, ground water monitoring wells), and subsurface conditions may vary through tune and with <br /> distance from these data points No other warranty, expressed or implied, Is made as to the <br /> professional recommendations contained in this report <br /> S <br /> i <br /> ' Advanced GeoEnvironmental,Inc <br />