My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004692
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
423
>
3500 - Local Oversight Program
>
PR0544427
>
ARCHIVED REPORTS XR0004692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 9:23:26 AM
Creation date
5/7/2019 8:51:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004692
RECORD_ID
PR0544427
PE
3528
FACILITY_ID
FA0004581
FACILITY_NAME
CHASE CHEVROLET*
STREET_NUMBER
423
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
423 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> `I 1 <br /> ' 27 February 2004 <br /> AGE-NC Project No 95-0144 <br /> ' Page 3 of 7 <br /> ' 2 13 Well Completions ; <br /> 1 <br /> Pilot boring MW-25 was completed as a ground water monitoring well using two-inch diameter PVC <br /> ' casing with 0 010-inch slotted screen installed from approximately 50 feet to 55 feet bsg in boring <br /> MW-25 with blank casing extended to the surface The filter pack(No 2112 sand)was installed from <br /> the bottom of each boring to approximately two feet above the top of the screened interval A <br /> ' nominal 3-foot bentonite plug was then Installed above the filter pack and hydrated The wells were <br /> then grouted to near the surface with portland cement Water-tight,traffic-rated well boxes were then <br /> installed over the wells An as-built well diagram is depicted on the boring log in Appendix A <br /> 1 <br /> 2 14 Laboratory Analyses of Soil Sample <br /> ' Soil samples collected from pilot boring MW-25 were labeled, stored on ice and transported under <br /> chain-of-custody to Cal Tech Environmental Laboratories (CTEL), a California Department of <br /> ' Health Services (DHS)-certified analytical laboratory One soil sample was analyzed for <br /> . Total petroleum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d) in <br /> ' accordance with EPA Method 8015M, <br /> • Benzene, toluene, ethylbenzene and total xylene (BTEX) in accordance with EPA Method <br /> _ 8260B, and <br /> • The fuel additives di-isopropyl ether (DIPE), ethyl tertiary-butyl ether (ETBE), MTBE, <br /> tertiary-amyl methyl ether (TAME), tertiary butanol (TBA), ethanol, methanol, 1,2- <br /> ' dibromoethane(EDB) and 1,2-dichloroethane(1,2-DCA) in accordance with EPA Method <br /> 8260B <br /> 1 , <br /> 2 1 5 Monitoring Well Development <br /> On 29 July 2003,monitoring well MW-25 was developed utilizing a Waterra inertial pump equipped <br /> with 518" tubing and a foot-check valve Approximately ten casing-water volumes of water (60 <br /> ' gallons)were purged from well MW-25 Purged water was stored in 55-gallon DOT-approved drums <br /> on-site <br /> ' Advanced Geo Environmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.