Laserfiche WebLink
i <br /> `I 1 <br /> ' 27 February 2004 <br /> AGE-NC Project No 95-0144 <br /> ' Page 3 of 7 <br /> ' 2 13 Well Completions ; <br /> 1 <br /> Pilot boring MW-25 was completed as a ground water monitoring well using two-inch diameter PVC <br /> ' casing with 0 010-inch slotted screen installed from approximately 50 feet to 55 feet bsg in boring <br /> MW-25 with blank casing extended to the surface The filter pack(No 2112 sand)was installed from <br /> the bottom of each boring to approximately two feet above the top of the screened interval A <br /> ' nominal 3-foot bentonite plug was then Installed above the filter pack and hydrated The wells were <br /> then grouted to near the surface with portland cement Water-tight,traffic-rated well boxes were then <br /> installed over the wells An as-built well diagram is depicted on the boring log in Appendix A <br /> 1 <br /> 2 14 Laboratory Analyses of Soil Sample <br /> ' Soil samples collected from pilot boring MW-25 were labeled, stored on ice and transported under <br /> chain-of-custody to Cal Tech Environmental Laboratories (CTEL), a California Department of <br /> ' Health Services (DHS)-certified analytical laboratory One soil sample was analyzed for <br /> . Total petroleum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d) in <br /> ' accordance with EPA Method 8015M, <br /> • Benzene, toluene, ethylbenzene and total xylene (BTEX) in accordance with EPA Method <br /> _ 8260B, and <br /> • The fuel additives di-isopropyl ether (DIPE), ethyl tertiary-butyl ether (ETBE), MTBE, <br /> tertiary-amyl methyl ether (TAME), tertiary butanol (TBA), ethanol, methanol, 1,2- <br /> ' dibromoethane(EDB) and 1,2-dichloroethane(1,2-DCA) in accordance with EPA Method <br /> 8260B <br /> 1 , <br /> 2 1 5 Monitoring Well Development <br /> On 29 July 2003,monitoring well MW-25 was developed utilizing a Waterra inertial pump equipped <br /> with 518" tubing and a foot-check valve Approximately ten casing-water volumes of water (60 <br /> ' gallons)were purged from well MW-25 Purged water was stored in 55-gallon DOT-approved drums <br /> on-site <br /> ' Advanced Geo Environmental,Inc <br />