My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004798
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
423
>
3500 - Local Oversight Program
>
PR0544427
>
ARCHIVED REPORTS XR0004798
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 9:27:02 AM
Creation date
5/7/2019 9:13:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004798
RECORD_ID
PR0544427
PE
3528
FACILITY_ID
FA0004581
FACILITY_NAME
CHASE CHEVROLET*
STREET_NUMBER
423
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
423 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> I , <br /> Page <br /> 10 INTRODUCTION AND SCOPE OF WORK 1 <br /> ' 20 BACKGROUND 1 <br /> r <br /> 21 SITE LOCATION AND DESCRIPTION 1 , <br /> ' <br /> 22 REMOVAL OF UNDERGROUND STORAGE TANKS 1 <br /> 23 REGIONAL GEOLOGICALIHYDROGEOLOGICAL SETTING 2 <br /> 24 - LOCAL GROUND WATER SETTING 2 <br /> 25 MUNICIPAL WELL SURVEY 2 <br /> 30 ASSESSMENT OF HYDROCARBON-IMPACTED SOIL AND GROUND WATER 3 <br /> 1 1, <br /> 40 POTENTIAL IMPACT ON NEARBY SURFACE AND GROUND WATER 4 <br /> 50 SOIL R) MEDIATION ALTERNATIVES 5 <br /> 51 SOIL VAPOR EXTRACTION 5 <br /> 511 PRINCIPLES 5 <br /> ' 5 I,2 REQUIRED SOIL CONDITIONS 6 <br /> r <br /> 5 1 3 MONITORING ACTIVITIES 6 , <br /> 5 1 4 FEASIBILITY 7 ' <br /> M} 515 DURATION - 7 <br /> ' 5 1 6 ESTIMATED COST OF SOIL VAPOR EXTRACTION "7 <br /> ' 5 2 EX-SITU TREATMENT OF IMPACTED SOIL 8 <br /> 5 2 1 EXCAVATION 8 <br /> 5 2 2 FEASIBILITY OF EXCAVATION 8 <br /> 5 2 3 ESTIMATED COSTS FOR EXCAVATION 9 <br /> 5 3 IN-SITU BIOREMEDIATION 9 <br /> 53 1' PRINCIPLES 9 <br /> ' 5-3 2 NUTRIENT REQUIREMENTS AND TOXICITY 10 <br /> 5 3 3 INOCULATION WELLS 10 <br /> 5 3 4 MONITORING ACTIVITIES 1 I <br /> 5 3 5 ` DURATION 11 <br /> 5 3 6 FEASIBILITY 11 <br /> 5 3 7 ESTIMATED COSTS FOR IN-SITU BIOREMEDIATION 11 <br /> ' <br /> 54 NATURAL ATTENUATION 12 " <br /> r <br /> , <br /> t <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.