My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
5749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515802
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 10:27:48 AM
Creation date
5/7/2019 10:27:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515802
PE
2832
FACILITY_ID
FA0021241
FACILITY_NAME
TRACY MUNICIPAL AIRPORT
STREET_NUMBER
5749
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5749 S TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention, Control and Countermeasure(SPCC) Plan November <br /> Tracy Municipal Airport 5749 South Tracy Boulevard.Tracy,CA 95377 2017 <br /> SPILL PREVENTION,CONTROL, & COUNTERMEASURE (SPCC)PLAN <br /> PART A: GENERAL INFORMATION <br /> 1. Name of Facility: Tracy Municipal Airport <br /> 2. Type of Facility: General Aviation Airport <br /> 3. Initial Date of Facility Operation: 1929 <br /> wa. Location of Facility: 5749 South Tracy Boulevard <br /> Tracy, CA 95377 <br /> 5. Name& Address of Owner/Operator: City of Tracy <br /> 333 Civic Center Plaza <br /> Tracy, CA 95376 <br /> (209)—831 - 6215 <br /> 6. Person Responsible for Plan Management: Ed Lovell, (209) 831-6204 <br /> 7. Periodic Review <br /> This SPCC Plan has been prepared to conform to the requirements of the applicable <br /> Federal regulation,40 CFR 112. To ensure it remains current,it will be reviewed and <br /> evaluated at least once every five years. Within six months of the review, it will be <br /> amended to include more effective prevention and control technology if the technology <br /> is field proven and will significantly reduce the likelihood of an oil spill event. This <br /> plan will also be amended within six months whenever there is a change in facility <br /> design, construction, operation, or maintenance that materially affects the facility's <br /> potential for the discharge of oil. All amendments will be certified by a Professional <br /> Engineer in accordance with 40 CPR,Part 112.3(d). <br /> s. Management Approval <br /> The management of this facility shall implement this SPCC Plan as herein described. <br /> Signature`s Title: ! /'� —`�`� "� <br /> Date: LS <br /> Strandberg Associates l(866)388-0404 reiateret v'nlnvate'sr V com 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.