Laserfiche WebLink
u �1 <br /> Once we have received the ATC,the soil vapor and electrical conveyance lines and system compound will be <br /> constructed and the SVE system and catalytic oxidizer will be installed. We will notify the SJVAPCD at least <br /> fifteen(15)days prior to conducting system startup and the initial compliance source tests. Please call me if you <br /> have any questions at(209)369-9421 or(209)601-6694. Thank you very much. <br /> Sincerely, <br /> �o�NG\NEERhyG Fo <br /> G <br /> STEPHEN G. ?o <br /> MUIR <br /> No. EG 1224 -i <br /> Stephen G.Muir * Exp.Date 't <br /> Certified Engineering Geologist#1224 1p�h <br /> Expiration Date:08/31/2013 q op CA�IFCP <br /> Attachments: 1. Application Fee Check Payment <br /> 2. Application for ATC/PTO <br /> 3. Regulatory Agency Correspondence <br /> \D\Environmental\Pa arTexaco\SJVAPCD 10252012.wpd 2 <br />