My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:20:17 PM
Creation date
5/7/2019 2:07:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lerner Texaco <br /> 521 North Cherokee Lane, Lodi <br /> Site Code: 1324 <br /> 19 April 1997 <br /> Page 4 <br /> Health Risk Assessment: <br /> I will prepare a health risk assessment following the guidelines promulgated by the <br /> American Standards for Testing and Materials (ASTM) Method E-1739. I will use <br /> the Tier 1/Tier 2 Risk Based Corrective Action (RBCA) spreadsheet produced by <br /> GSI to evaluate the potential risk increase that the gasoline release may have on <br /> both on-site commercial, and off-site commercial and residential, receptors. The <br /> spreadsheet will be modified to reflect California's slope factor for benzene. <br /> Schedule: <br /> Within three weeks of acceptance/approval of the scope of work outlined above by <br /> the SJCPHD/EHD, a drilling contractor will be selected to assist with the completion <br /> of the boring and well installations and a "pre-approval" package will be submitted <br /> to the Fund. <br /> Pre-approval plus 2 weeks: Encroachment and well installation permitting. <br /> Well survey. <br /> Pre-approval plus 5 weeks: Boring/Well installing, surveying, developing, <br /> and sampling. <br /> Pre-approval plus 8 weeks: Receipt of analytical data, report preparation. <br /> Pre-approval plus 12 weeks: Report submittal. <br /> Pre-approval plus 17 weeks: First round of quarterly groundwater sampling. <br /> Because pilot testing of a vapor extraction system was not a "bid item" in the original work <br /> plan prepared by WEGE for bid solicitation, I am not sure that the SB 2004 Fund <br /> administration will allow me to perform that task. Mr. H.M. 'Cris' Hamilton and I will be <br /> inquiring. If they are willing to reimburse for reasonable costs, I will submit a letter <br /> amendment to include a vapor extraction pilot test with the above proposed scope of work. <br /> I would anticipate that the inclusion of the pilot test will delay the report submittal by <br /> approximately six weeks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.