My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:20:17 PM
Creation date
5/7/2019 2:07:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 2 8 1994 <br /> ENVPERMIMES RVICESNTAL LTH <br /> 26 September 1994 <br /> Ms. Linda Turkatte <br /> San Joaquin County Public Health Services <br /> Environmental Health Department <br /> P.O.Box 338 <br /> Stockton, CA 95201-0388 <br /> Re: Free-Product Removal <br /> 521 North Cherokee Lane, Lodi, California <br /> Site Code: 1324 <br /> Dear Ms. Turkatte: <br /> Per your direction, I have produced a workplan which addresses the removal of the free- <br /> product (FP) layer measured at MW-3. On September 30, 1994, I will be onsite to perform <br /> a short test to assess the effectiveness of bailing for FP removal. If effective, I propose to <br /> perform the removal quarterly with the monitor well sampling. If apparently ineffective, I <br /> will arrange to employ your second option (installation of a passive skimmer). If a skimmer <br /> is installed, the unit will be checked monthly for the first quarter to assess the removal rate. <br /> Depending on the rate of removal, a quarterly Operation and Maintenance schedule may be <br /> warranted. <br /> Pending review of the 13 March 1994 workplan (approved August 23, 1994), a sampling <br /> event was performed on 22 July 1994. MW-1 did not recover sufficiently (<0.1 feet per <br /> hour) to allow representative sampling, MW-2 was still impacted by TPH (as gasoline) and <br /> BTEX, MW-3 had a measured free-product thickness of 0.03 feet. Based on timing of your <br /> subsequent approval of the workplan, I have postponed preparation of a sampling report. It <br /> is my intention to supply the details in a sampling report to be submitted with the boring/well <br /> permit application. <br /> I appreciate your assistance with this project. If you have any questions, please do not <br /> hesitate to leave a message for me at (916)-666-9315. , .. <br /> Sina6rely, - -D GEp <br /> St !0 <br /> Dana W. Booth, R.G. y <br /> Attachment No 55)°5 <br /> Exp- <br /> �l9rF 0FaQe�%� <br /> F CA1\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.