My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:20:17 PM
Creation date
5/7/2019 2:07:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 01'2PARMARTEXACO <br /> aser <br /> as <br /> Go CEO RHOME IMANACEPROJECTSIR PORT §� LOGOUT <br /> Path to Closure Plan OPEN-REMEDIATION <br /> PARMAR TEMCO(70607700146)-MAP THIS arT <br /> CIE-M1 OVE IG TAE ES <br /> 521 CHEROKEE LNN ACTIVITIES REPORT SqN JOAOUINCOUNIYLOP(LEAD)-LASE a:1320 <br /> LODI,CA 95240 CASEWORKER: RIN-SUPERVISOR:ADRIENNE ELLSAESSER <br /> PUBLIC VJEBPAGE <br /> $ANJSI E COUNTY CENTIME VALLEY'JAMES <br /> (REGION SS)-CASER: R:CO <br /> CASE SUMIAARY FOR THIS5nE CASEWORKER: AMTC BARTON-SUPEFWSOR:LORILONOON <br /> VIEWE <br /> CUF Cann 0:8790 CUF Ptloriry Assigned:B CUF Amours Pakh}99TH) <br /> THIS PROJECT WAS UST MODIFIED BYN LN DCR NON TI820143:36:11PM-ta6LOBY <br /> THIS SITE HAS SUBMITTALS.CLICK UM TO OPEN A NEW WINODW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> TH 09 E N <br /> Path to Closure Plan THISVERSION ISFINAL AS OF]AV1011 PATH <br /> TO <br /> CLOSURE HISTORY <br /> IMPEDIMENT 1: <br /> as the nature,extent,and mobility of the release ❑ Procedural Impediment-NFO <br /> Ge ral Criteria E:A conceptual site model that assess <br /> NOT been developed <br /> COMPLETION DALE <br /> Ste to Resolve Im tliment 1-Ste 1:- P <br /> 3ubmi[ work plan to conplete down-gxadient delineation <br /> of impacted 9iountlwate[ plume. P CJ LTE Dq gLIU LOATE <br /> 9 02014 <br /> Sb to Resolve lm tliment[-Sle 2:- E P LOMMEl1014 DATE <br /> complete down-gxadient delineation of impacted grocndwatex E D pCTUA A <br /> &9012015 _.1 <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> .neral Criteria F:Secondary source hes NOT bean removed to the extent practicable ❑ Procedural Impetliment-m <br /> to Resolve lm tliment2-51 COMPLETION DATE <br /> Continue with remediatio Dy sYz. J pL0 <br /> iZ312015 �— <br /> ro Raealwlm Imenl2-St 2:- COMPLETION DATE <br /> Implement and ..mediate groundwater through insitu air spaxging <br /> PROD ACTUALD <br /> 39012015 �g <br /> Step W Resolve lanImadinwend 2-Ste3:-DELETE STEP <br /> COMPLETION DATE <br /> Continue remediation until contaminant concentrations pass LTCP criteria and are .[elle. <br /> PROjL9VjiJUM ACTUAL DATE <br /> .. .11/312015 <br /> ADDADDITONALSTEP <br /> IMPEDIMENT 3: <br /> Media Specific Criteria:Petroleum Vapor Intrusion to Indoor Air:The site is NOT considered low-threat for 717 Procedural Impediment-NEy <br /> the vapor-intrusion-to-air pathway and site-specific conditions do NOT satisfy Items 2a,2b,or 2c. <br /> Conditions that do not meet the policy criteria: <br /> • TPH in the Bioattenuation Zone:Unknown <br /> • Bioaftenuation Zone Thickness:Unknown <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • Soil Gas Naphthalene:Unknown <br /> s to Rradvelm tllmeM3-Ste L- <br /> COMPLETON DATE <br /> utilizing site-specific data,sufficient <br /> dement data to vapor to site f hazatentiak 1s ata trusion lewd. or submit <br /> a work plan to collect sufficient tlata Co evaluate site for potential vapor intrusion hazard. <br /> 9/)02014F60"2111— I <br /> _ <br /> at• to Resoba lm tliment 3-Ste 2:- <br /> COMPLETION DATE <br /> Collect data required for the vapor intrusion evaluation, perhaps during the same scope of work [equixed <br /> to complete the down-gradient delineation of impacted groundwater and submit results in a repot[of PROJECTED DATE ACTUAL DATE <br /> findings. 3/372015 1 <br /> -- ADDADDITIONALSTEP . <br /> IMPEDIMENT 4: <br /> Media Specific Criteria:Direct Contact and Outdoor Air Exposure:The site is NOT considered low-threat r Procedural Impediment-IDEA <br /> for direct contact and outdoor air exposure as it does NOT meet 1,2,or 3. <br /> Conditions that do not meet the policy criteria: <br /> • Petroleum Constituents in SolL Unknown <br /> • Soil Concentrations of Benzene:Unknown <br /> • Soil Concentrations of EthylBenzene:Unknown <br /> • Soil Concentrations of Naphthalene:Unknown <br /> • Soil Concentrations of PAH:Unknown <br /> Stop to Reaolw Impetliment 4-SNP 1:-DELETE STEP COMPLETION DATE <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=TO... 7/17/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.