Laserfiche WebLink
Enclosures: References <br /> Figure 1 -Regional Site Location Map <br /> Figure 2 -Site Location Map <br /> Figure 3 -Site Activity Map <br /> Figure 4- Topographic Map of Site <br /> Figure 5 - Groundwater Surface Elevation Map <br /> Figure 6 - Hydrograph and TPH-gas and benzene concentrations for PT-MW-1 <br /> Figure 7 - TPH-Gas in Groundwater Isoconcentration Map <br /> Figure S - Benzene in Groundwater Isoconcentration Map <br /> Figure 9- Map Depicting Proposed Soil Borings and Monitoring Wells <br /> Table 1 - Tabulation of Groundwater Monitoring Results <br /> Table 2 - Summary of Groundwater Sample Analytical Results <br /> Table 3 - Tabulation of CPT Hydropunch Soil Boring Data <br /> Attachment 1 - PHSEHD Correspondence <br /> Attachment 2 - Health and Safety Plan with Map <br /> Attachment 3 - Groundwater Monitoring, Sampling, and Sample Management <br /> Procedures <br /> Attachment 4 Standard Operating Procedures for Soil Boring and Well <br /> Construction <br /> Attachment 5 - Monitoring Well Construction Details <br /> cc Mr James Barton, California Regional Water Quality Control Board, <br /> Central Valley Region (5) <br /> Main\D\EnvironmentaMarmarTexaco\Workpl"42003 wpd 19 <br />