My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001831
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:27:13 PM
Creation date
5/7/2019 2:17:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001831
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enclosures: References <br /> Figure 1 -Regional Site Location Map <br /> Figure 2 -Site Location Map <br /> Figure 3 -Site Activity Map <br /> Figure 4- Topographic Map of Site <br /> Figure 5 - Groundwater Surface Elevation Map <br /> Figure 6 - Hydrograph and TPH-gas and benzene concentrations for PT-MW-1 <br /> Figure 7 - TPH-Gas in Groundwater Isoconcentration Map <br /> Figure S - Benzene in Groundwater Isoconcentration Map <br /> Figure 9- Map Depicting Proposed Soil Borings and Monitoring Wells <br /> Table 1 - Tabulation of Groundwater Monitoring Results <br /> Table 2 - Summary of Groundwater Sample Analytical Results <br /> Table 3 - Tabulation of CPT Hydropunch Soil Boring Data <br /> Attachment 1 - PHSEHD Correspondence <br /> Attachment 2 - Health and Safety Plan with Map <br /> Attachment 3 - Groundwater Monitoring, Sampling, and Sample Management <br /> Procedures <br /> Attachment 4 Standard Operating Procedures for Soil Boring and Well <br /> Construction <br /> Attachment 5 - Monitoring Well Construction Details <br /> cc Mr James Barton, California Regional Water Quality Control Board, <br /> Central Valley Region (5) <br /> Main\D\EnvironmentaMarmarTexaco\Workpl"42003 wpd 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.