Laserfiche WebLink
1.0 Site Activities Conducted This Quarter <br /> Activities conducted during the first quarter have included (1) water sampling of 55 gallon drums <br /> of purge water stored at site on February 28, 2003, (2) groundwater monitoring and sampling of <br /> the three monitoring wells on April 1, 2003, (3) review of the PHSEHD and CRWQCB files for <br /> the site during March, 2003, (4) onsite meeting with PHSEHD representative to discuss future <br /> workplan submission on April 1, 2003, and (5) liaison with State Water Resource Control Board- <br /> Division of Financial Assistance (SWRCB-DFA) Cleanup Fund to prepare Reimbursement <br /> Request#2 for the site during March, 2003 <br /> Data Provided with this Report <br /> Site Location Map (Figure 1) <br /> Topographic Map of Site (Figure 2) <br /> Site Activity Map (Figure 3) <br /> Isoconcentration Contour Map of TPH-gasoline in Groundwater (Figure 4) <br /> Isoconcentration Contour Map of benzene in Groundwater (Figure 5) <br /> Summary of Monitoring Well Sampling Data (Table 1) <br /> Appendix 1- Analytical Laboratory Reports <br /> • <br /> MamlDlEnvironmentaKPamiarTexac-o\Repom\033103QSR wpd 2 <br />