Laserfiche WebLink
APR-21-97 MON 08:05 AM FHD/HMD FAX NO. 9163867011 P. 02 <br /> r� remediation alternative Therefore, several vapor wells should be installed to allow testing <br /> and remediation (if deemed necessary). <br /> Work plan Addendum <br /> This addendum provides the proposed locations and rationale for the welWbonngs <br /> recommended above Each of the welislborings will be installed in accordance with the <br /> 13 March 1994 work plan unless either otherwise stated herein or discussed with (and <br /> approved by) the lead regulatory agency (SJCPHDIEHD). <br /> Well Survey* <br /> A survey of supply wells will be performed. Based on current guidelines by the <br /> Central Valley Regional Water Quality Control Board (CVRWQCB),the surrey will <br /> be performed for wells within 2,000 feet of the site The survey will include <br /> reviewing the State of California, Department of Water Resources reoords and <br /> contacting the water purveyor(s) with the 2,000 foot survey area <br /> Air Sampling- <br /> Five air samples are proposed_ Each of the samples will be collected in a Summa <br /> canister held approximately 5-feet above ground surface (assumed breathing <br /> zone) Three of the samples will be collected outdoors while two will be collected <br /> from within the structure <br /> One outdoor sample will be collected off-site up-wind to assess 'background" <br />. volatile concentrations A second outdoor sample will be collected in the dispenser <br /> area The third sample will be collected from above the previous location of the <br /> U STs <br /> One indoor sample will be collected from each of the two rooms (office and rest <br /> room) of the structure. Because the structure's main bay is used for automobile <br /> repair, sources of volatile organic emissions beyond the scope of this assessment <br /> will render any sampling meaningless <br /> Soil Barings: <br /> Two soil bonngs (8-4 and B-5) will be advanced in the pump island area (Plate 3 <br /> from the 1 August 1535 work plan has been attached for your convenience) <br /> Because of the limited access, the borings; will be slant dniled to allow the <br /> collection of a sail sample beneath each end of each pump island It is anticipated <br /> that the southem end samples can be collected at a depth of approximately 5 feet <br /> below ground surface (bgs) while the northern end samples may be as deep as _ <br /> 20' feet bgs <br /> Monitor Wells <br /> Two on-site and five off-site monitor wells are proposed to verify the contaminant <br /> limits established with the CPT survey and better define the groundwater plume <br /> in the southwest quadrant (Plate 3) Soil samples will be collected to confirm <br /> lithology at 10-foot Intervals A soil sample from within the capillary fringe of each <br />